1

ADR screening session

Le·la directeur·rice de plateau visionne le film en présence du·de la réalisateur·trice et de l’équipe de post-production. Il·elle centralise les demandes de post-synchronisations (techniques - son - rajouts - jeu) et d'ambiances. Le relevé des dialogues est annoté sur iPad, puis envoyé à l’équipe pour une cohésion totale.

arrows
2

Preparation / Planning

Our team assesses recording times according to identified needs. We establish a schedule based on the availability of actors as communicated by post-production management. For loop group actors, we manage casting, invitations to recordings, drawing up of work contracts and remuneration.

arrows
3

Lip-sync band detection or ADR

We create a lip-sync band with Mosaïc software, or ADRs with EdiCue.

arrows
4

Recording

The ADR supervisor is in charge of dialogue synchronization in the recording studio while also supporting the director in ensuring consistency between live acting and post- synchronization. He/she makes sure that recording proceeds as scheduled. The recording session is managed using ProTools software.

arrows
5

Editing

We edit the recordings in-house using ProTools. Our team also uses Auto-Align for phasing, and Izotope RX as an add-on if needed. Sound editing is readjusted to match the latest image editing. Sessions are delivered via ProTools and can be exported as AAF if required.